Quick answer
For your first Permits task, do not change many settings: run defaults once, then adjust one item at a time. Drilling/electrical/connection may need permits/inspection.
Why it matters
Change one variable at a time so you know which setting matters.
Drilling.
Step by step
- Confirm geology/depth/usage/quality/permits.
- Separate drilling/pump/tank/treatment/electrical/permits.
- Get 2-3 quotes; confirm depth/yield/warranty.
- Test water before choosing treatment; don't guess.
Common mistakes
- Buying treatment without testing.
- Comparing drilling price only, not depth/casing/yield.
- Ignoring pump/tank/electrical/permits.
- Not checking warranty/maintenance.
Checklist
- Geology/depth/usage/quality.
- Drilling/casing/pump/tank/electrical.
- Testing/treatment/softening/filtration.
- Permits/warranty/maintenance.
- Budget/emergency/backup power.
Key facts
- Drilling.
- Electrical.
- Inspection.
FAQ
How do I start with Permits?
For your first Permits task, do not change many settings: run defaults once, then adjust one item at a time. Drilling/electrical/connection may need permits/inspection.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: EPA